Application Guide - Manufactured Dwelling Placement

Prerequisites

Prior to applying for the actual placement permit, you will need to complete the following steps:

  • Ensure land use requirements are met through Planning, if applicable.  
  • Ensure there is an approved septic system or approval to install a septic system, if applicable.
  • Ensure there is a driveway access (Driveway Permit)
  • Create an Oregon ePermitting and have licenses associated to your account. Homeowners, make sure to associate the Homeowners Licenses to your account. Visit Oregon ePermitting FAQs for more information.

 

Required, Conditional and Reference Forms

 

Required Forms

Conditional Forms

Reference Forms - used as guidelines for creating your construction plans , site plan, calculations and other important documents that need to be uploaded into the permit. See the document list for how to group these pages together. 

Application Instructions (step by step with images)

 
     

 

Summary of Instructions

 

Step 1: Log into your account on the Oregon ePermitting website. Follow instructions located on the webpage here to create an account. You will also need to associate Licenses to your account in order to apply for the permit.

Step 2: Search for your address and then select the Application Type as follows:

  • Select Residential - Manufactured Dwelling Placement application type.
  • If you were prompted to apply for a Driveway permit during your research, you can also select the Driveway application type at this time as well.

Step 3: Fill in any other necessary information such as the Contact information, contractors assigned to the job, site contact, applicant and any required information which will be marked with a red asterisk (*).

Step 4: Upload all required Documents, view the table below for more details as to what documents are required.

Step 5: Upload the required Documents. Note: Combine the documents as noted below. For example, you do not need to individually separate out the building cross sections, instead combine it as part of the construction plan pdf.

Step 6: Pay your fees

Required Documents

# Document Name/Type Document Category for Upload
1 Manufactured Home Placement Application Building Application
2

Driveway Application (if you were prompted to apply for a Driveway Access, you must upload the Driveway Application at this time )

Building Application

3

Site Plan

Please review the Site Plan Requirements and Example as there are elements to the drawing that need to be present.
Plans - Site Plan
4

Photograph and/or brochure from manufactured home dealer, including exterior elevation and ridge height

Plans - Construction
5 Floor Plan with room uses identified Plans - Construction

 

 